Nadali -Helmand Road BoQ (  Bill of Quantities)

لیکنه د محترم انجنیر سیف الله

ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

د سړک ډیزاین د پروژې ورستۍ برخه: 

 

Bill of Quantities (BOQ), Nadali Road Helmand Province

 

 

 

 

 

 

Pay Item No.

Item Description

Unit

Quantity

Rate
US$

Amount US$

Bill No.1 : Preliminaries and general

1.1

Mobilization

LS

1

20,000

20,000.00

1.2

Demobilization

LS

1

10,000

10,000.00

1.3

Clearing and cleaning of vegetation

LS

1

1,000

1,000.00

1.4

Clearing and cleaning of drainage paths

m

6,000

0.1

600.00

TOTAL BILL NO. 1

31,600.00

Bill No.2 :  Earth Works

2.1

Setting out alignments

m

6,000

5.00

30,000.00

2.2

Excavation of drainage

m3

12,000

3.00

36,000.00

2.2

Excavation of culvert ,wash and retaining wall

m3

14,419

3.00

43,257.00

TOTAL BILL NO. 2

109,257.00

Bill No.3 : Sub base ,Base course and Asphalt Works

3.1

Sub grade preparation

m2

54,000

7.00

378,000.00

3.2

Sub base gravel

m3

5,400

9.00

48,600.00

3.3

Sub base crushed gravel

m3

5,400

15.00

81,000.00

3.4

base course preparation

m3

5,400

22.00

118,800.00

3.5

prime coat

m2

54,000

1.00

54,000.00

3.6

Asphalt wearing course

 

27,000

15.00

405,000.00

TOTAL BILL NO. 3

1,085,400.00

 Bill No.4: Masonry Work

4.1

Stone Masonry Culvert, cement mortared

m3

751

45.00

33,772.50

4.2

Stone Masonry of Retaining Wall, wash & side drainage

m3

4,054

45.00

182,430.00

4.5

Pointing

m3

6,597

1.00

6,597.00

TOTAL BILL NO.4

222,799.50

Bill No.5: Concrete for structures

5.1

R.C.C for culvert, wash and retaining wall(1:1.5:3)

m3

1,331.00

135.00

179,685.00

5.2

P.C.C for culvert, wash, side drainage and retaining wall

m3

5,235.00

50.00

261,750.00

5.3

RCC 0.5 m Pipes

m

108.00

10.00

1,080.00

TOTAL BILL NO.5

442,515.00

Bill No.6: Road Signs and Marking

6.1

Road Signs and guard posts

LS

 

2,000

2,000.00

TOTAL BILL NO.6

2,000.00

GRAND TOTAL

1,893,571.50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

----------------------------------------------------------------------------------------------------------------

Table 1. Summary of Costs Estimate

 

Bill No.

Description

Amount
$US

 

1

Preliminaries and general

31,600.00

 

2

 Earth works

109,257.00

 

3

Sub base, Base course and Asphalt works

1,085,400.00

 

4

Masonry works

222,799.50

 

5

Concrete Works

442,515.00

 

6

Road Signs and Marking

2,000.00

 

Sub Total Base Cost

1,893,571.50

 

7

Contingencies (10%) & Maintenance (8%)

340,842.87

 

BID PRICE

2,234,414.37

---------------------------------------------------------------------------------------------------------------- 

                  Table 2. Summary of Cost Estimate      

 

ملاحظات

 

ارزښت په ډالرو

ارزښت په افغانيو

دكارنوعيت

شماره

 

1$=50 Af

2,234,414.37

111,720,718.5

دسرك مجموعي ارزښت

۱

 

 

372,402.395

18,620,119.75

دسرك ديوكيلومتر ارزښت

۲

 

 

11,776.398

588,819.887

دسرك ديومترمربع ارزښت

۳

 ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

د سړک ډیزاین د پروژې پای

له محترم انجنیر سیف الله څخه په مننې سره چې د سړک ډیزاین د دیپلوم پروژه یې د سیول انجنیري ویبلاګ په واک کې ورکړه هیله ده چې د ګرانو هیوادوالو او په ځانګړي ډول د ځوانو انجنیرانو د پاملرنې او ګټه اخستنې وړ وګرځې.

په بیساري اسلامې او پښتنې مېنه

ستاسو د دعا محتاج ، خلیل الله مایار