Bill of Quantities (BOQ), Nadali Road Helmand Province |
||||||||||||||
|
|
|
|
|
|
|||||||||
Pay Item No. |
Item Description |
Unit |
Quantity |
Rate |
Amount US$ |
|||||||||
Bill No.1 : Preliminaries and general |
||||||||||||||
1.1 |
Mobilization |
LS |
1 |
20,000 |
20,000.00 |
|||||||||
1.2 |
Demobilization |
LS |
1 |
10,000 |
10,000.00 |
|||||||||
1.3 |
Clearing and cleaning of vegetation |
LS |
1 |
1,000 |
1,000.00 |
|||||||||
1.4 |
Clearing and cleaning of drainage paths |
m |
6,000 |
0.1 |
600.00 |
|||||||||
TOTAL BILL NO. 1 |
31,600.00 |
|||||||||||||
Bill No.2 : Earth Works |
||||||||||||||
2.1 |
Setting out alignments |
m |
6,000 |
5.00 |
30,000.00 |
|||||||||
2.2 |
Excavation of drainage |
m3 |
12,000 |
3.00 |
36,000.00 |
|||||||||
2.2 |
Excavation of culvert ,wash and retaining wall |
m3 |
14,419 |
3.00 |
43,257.00 |
|||||||||
TOTAL BILL NO. 2 |
109,257.00 |
|||||||||||||
Bill No.3 : Sub base ,Base course and Asphalt Works |
||||||||||||||
3.1 |
Sub grade preparation |
m2 |
54,000 |
7.00 |
378,000.00 |
|||||||||
3.2 |
Sub base gravel |
m3 |
5,400 |
9.00 |
48,600.00 |
|||||||||
3.3 |
Sub base crushed gravel |
m3 |
5,400 |
15.00 |
81,000.00 |
|||||||||
3.4 |
base course preparation |
m3 |
5,400 |
22.00 |
118,800.00 |
|||||||||
3.5 |
prime coat |
m2 |
54,000 |
1.00 |
54,000.00 |
|||||||||
3.6 |
Asphalt wearing course |
|
27,000 |
15.00 |
405,000.00 |
|||||||||
TOTAL BILL NO. 3 |
1,085,400.00 |
|||||||||||||
Bill No.4: Masonry Work |
||||||||||||||
4.1 |
Stone Masonry Culvert, cement mortared |
m3 |
751 |
45.00 |
33,772.50 |
|||||||||
4.2 |
Stone Masonry of Retaining Wall, wash & side drainage |
m3 |
4,054 |
45.00 |
182,430.00 |
|||||||||
4.5 |
Pointing |
m3 |
6,597 |
1.00 |
6,597.00 |
|||||||||
TOTAL BILL NO.4 |
222,799.50 |
|||||||||||||
Bill No.5: Concrete for structures |
||||||||||||||
5.1 |
R.C.C for culvert, wash and retaining wall(1:1.5:3) |
m3 |
1,331.00 |
135.00 |
179,685.00 |
|||||||||
5.2 |
P.C.C for culvert, wash, side drainage and retaining wall |
m3 |
5,235.00 |
50.00 |
261,750.00 |
|||||||||
5.3 |
RCC 0.5 m Pipes |
m |
108.00 |
10.00 |
1,080.00 |
|||||||||
TOTAL BILL NO.5 |
442,515.00 |
|||||||||||||
Bill No.6: Road Signs and Marking |
||||||||||||||
6.1 |
Road Signs and guard posts |
LS |
|
2,000 |
2,000.00 |
|||||||||
TOTAL BILL NO.6 |
2,000.00 |
|||||||||||||
GRAND TOTAL |
1,893,571.50 |
----------------------------------------------------------------------------------------------------------------
Table 1. Summary of Costs Estimate |
|||
|
Bill No. |
Description |
Amount |
|
1 |
Preliminaries and general |
31,600.00 |
|
2 |
Earth works |
109,257.00 |
|
3 |
Sub base, Base course and Asphalt works |
1,085,400.00 |
|
4 |
Masonry works |
222,799.50 |
|
5 |
Concrete Works |
442,515.00 |
|
6 |
Road Signs and Marking |
2,000.00 |
|
Sub Total Base Cost |
1,893,571.50 |
|
|
7 |
Contingencies (10%) & Maintenance (8%) |
340,842.87 |
|
BID PRICE |
2,234,414.37 |
----------------------------------------------------------------------------------------------------------------
Table 2. Summary of Cost Estimate
ملاحظات
|
ارزښت په ډالرو |
ارزښت په افغانيو |
دكارنوعيت |
شماره |
1$=50 Af |
2,234,414.37 |
111,720,718.5 |
دسرك مجموعي ارزښت |
۱ |
|
372,402.395 |
18,620,119.75 |
دسرك ديوكيلومتر ارزښت |
۲ |
|
11,776.398 |
588,819.887 |
دسرك ديومترمربع ارزښت |
۳ |
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
د سړک ډیزاین د پروژې پای
له محترم انجنیر سیف الله څخه په مننې سره چې د سړک ډیزاین د دیپلوم پروژه یې د سیول انجنیري ویبلاګ په واک کې ورکړه هیله ده چې د ګرانو هیوادوالو او په ځانګړي ډول د ځوانو انجنیرانو د پاملرنې او ګټه اخستنې وړ وګرځې.
په بیساري اسلامې او پښتنې مېنه
ستاسو د دعا محتاج ، خلیل الله مایار